Guides / Lighting submittal checklist

Lighting submittal checklist: what to verify before it goes to the engineer

Most lighting submittals come back for small things: a listing that is not on the cut sheet, a driver option missing from the catalog number, a CCT that differs from the fixture schedule. Here is what to check, in the order engineers usually read it.

Start with the fixture schedule

Listings and certifications

Performance

Driver and controls

Documents engineers ask for

Check your own submittal against the spec

Upload the spec section and the product data. MeetsSpec answers every requirement with a page reference and flags what to fix, in a few minutes. Free.

Run a free check