For electrical and HVAC submittals

Know it meets spec before the engineer tells you it doesn't.

MeetsSpec reads the spec section and your product data, answers every requirement with a page reference, and flags each deviation before the submittal goes out.

Upload a spec section and a cut sheet. Results in minutes, free.

117requirements checked in one rooftop-unit spec section
10deviations found in a major-brand unit's product data
~6minfrom upload to a finished report, with a page reference for every answer
Reads CSI MasterFormatUL / ETL listingsAHRI ratingsASHRAE 90.1DLC QPLENERGY STARBABA · Buy American

The cost of a resubmittal

One missed line sends the whole package back.

A spec section can hold a hundred requirements, and the answers are scattered across cut sheets, listings and factory letters. Miss one, and the clock starts over.

Review cycle

Every round trip costs weeks

Specs commonly give the engineer 10 to 15 working days per review. A rejection means you wait twice.

SubmittedDay 0
Revise and resubmitDay 14
ResubmittedDay 19
ApprovedDay 33
Schedule

Long-lead gear waits on approval

Rooftop units, switchgear and fixtures are not released for production until the submittal is approved. A late approval becomes a late delivery.

Substitutions

Rejected on paperwork

A missing BABA letter, AHRI certificate or listing is enough to reject an otherwise equal product.

What it catches

The things that get submittals sent back.

MeetsSpec does the first pass, so your team reviews the exceptions instead of reading every line.

  • Values out of rangeIEER and SEER2, airflow, sound levels, efficacy, CRI, voltages, enclosure types.
  • Missing listings and certificatesUL, AHRI, DLC tier, ENERGY STAR and BABA letters the spec asks for and the package lacks.
  • Options hidden in the model numberWhen a requirement is met only by an ordering option, you are told which one to specify.
  • Unit mismatches°C against °F, tons against Btu/h, lm against lm/W, metric data against imperial specs.

How it works

From spec section to compliance sheet in one pass.

  1. 01

    Upload the spec

    One spec section, or the technical requirements of a bid package. PDF, including scans.

  2. 02

    Add the product data

    Cut sheets, equipment data, listings and certificates for the item you are submitting.

  3. 03

    Get the report

    Every requirement with a verdict, a page reference and a remark, plus what to request from the manufacturer. Export to Excel or PDF.

Riverside_23-74-13_RTU-1_compliance.xlsxRTU-1 · RTU-2 · Summary
Spec sectionRequirementProposed productStatusRemarks
2.2.ADouble-wall insulated casingSingle-wall galvanized cabinetDeviationRequest double-wall option or submit as deviation.
2.4.BIEER per ASHRAE 90.1IEER 15.0, AHRI 340/360 (p. 7)Complies
2.6.CBACnet IP interface to BASBACnet MS/TP with premium controllerReviewNeeds MS/TP-to-IP router or IP option.
1.5.BWind load qualificationNot statedMissing infoRequest certificate from manufacturer.

Columns follow the layout reviewers expect. Full sample reports (PDF): rooftop unit · lighting.

Example

See the evidence behind every verdict.

Seven requirements from a lighting spec section, checked against a manufacturer cut sheet. Select any line to see where the answer came from.

Riverside Elementary/26 51 00 Interior Lighting/Type A1
Export
2 comply3 deviations2 to review
SectionRequirementFoundStatus

Illustrative project.

Who it's for

Built for the people who put their name on the package.

Contractors

Electrical and mechanical

Build the product data package and the compliance sheet together, and catch deviations before the engineer does.

  • Lighting, switchgear, panelboards
  • Rooftop units, air handlers, fans
  • Fewer revise-and-resubmit cycles

Reps and distributors

Submittals and substitutions

Show the engineer your product meets spec, line by line, with every claim tied to a page.

  • Substitution requests that hold up
  • Model-number options called out
  • A list of what to ask the factory for

Bids

Government and public work

Answer the technical requirements of a solicitation without leaving a line unaddressed.

  • Compliance matrix from the solicitation itself
  • Buy American and BABA clauses flagged
  • Missing evidence found before the deadline

Your documents

Handled carefully, kept briefly.

Used only for your check

Your files are read to prepare your compliance sheet and for nothing else. They are never shared or published.

Deleted within 7 days

Online checks do not keep your files (queued checks hold them until the report is sent). Results are deleted within 7 days, or right away if you ask.

Never used for training

Your documents are not used to train AI models, ours or anyone else's.

FAQ

Questions teams ask first.

Does it replace the engineer or the estimator?

No. It does the first pass: it flags possible deviations and missing evidence and shows where each answer came from. What goes into the submittal, and the responsibility for it, stays with your team.

What if the cut sheet doesn't mention a requirement?

The line is marked as missing information, so you know to add a listing, request a letter from the manufacturer, or choose a different product.

Which trades does it cover?

Electrical (Division 26: lighting, distribution equipment, wire and devices) and mechanical/HVAC (Division 23: rooftop units, air handlers, fans, split systems and other equipment). Other divisions follow based on what early users need.

How does the free check work?

Upload one spec section and the product data and the result is on screen in a few minutes, with an Excel download. Prefer email? Send the files to [email protected] and you get a PDF report plus the Excel sheet within 48 hours.

How accurate is it?

Every verdict comes with the page it was based on, so you can verify it in seconds. When the evidence is incomplete or depends on an option, the line is marked for review rather than passed.

What will it cost after that?

Plans are expected to start at $79 per month. Everyone who tries the free check gets launch pricing.

Who's behind it

Built by an engineer, not a software company.

IgnasFounder, electrical engineer

I studied automation (BSc) and electrical power systems (MSc), and have worked in electrical engineering since, as a design engineer, a project engineer and now a project manager.

I built MeetsSpec because checking product data against requirements line by line is slow work where small misses get expensive. It compares each requirement in your spec with what the product data actually says, and shows where every answer came from, so you can verify it yourself.

Free spec check

Check one spec section now. Results in minutes.

Pick a section you are working on and the product data you plan to submit. Every requirement is checked while you wait. No charge, no commitment.

Run the free check
  1. Upload the documentsThe spec section and the cut sheets, as PDF.
  2. Every requirement is checkedEach line gets a verdict and a page reference to the source.
  3. Download the reportExcel or PDF, ready to edit. Or email the files to [email protected].

Not ready to upload?

Leave your email and we will reach out when it suits you.

We use your email only to contact you about MeetsSpec. Privacy notice.